Creating in-house popcorn manufacturing capability for WARP
Project overview
The refurbishment and remodelling of a live food production site to introduce popcorn manufacturing into an existing snack facility.
NIRAS were responsible for complete design from inception to completion managing both the build and process install and commissioning, with the construction works carried out in-house using IFP Construction.
Challenge
- Limited budget
- Short programme expectations
- Discovery of building issues as project progresses
- Proximity of existing production operations
Build duration: 6 months
Construction Project value: £4.8m
Total project value £13.6m
Project stage: Completed
NIRAS role: Process & Building Design
IFPC role: Principal Contractor